Accessibility

Our website is designed technically and in terms of content so that it can be used despite physical disabilities such as poor eyesight or blindness. It can be displayed and easily navigated on all internet-enabled devices in any browser.

To the accessibility declaration

Full text search

How can we help you?

Benefits

  • Train operation possible just 25 minutes after installation (at 30 °C rail temperature)
  • Very good results in tensile strength, static and dynamic (fatigue) tests
  • Long service life in the track

More products

  • Non-glued insulated rail joint made of GFRP in the track

    IRJ DCL

    The installation of the IRJ DCL in track is quick and easy thanks to the waiver of the glue. The low weight of the kit minimises workload and simplifies handling. This…

    View details
  • non-glued insulated rail joint made of steel in the track

    IRJ DMF

    The installation of the IRJ DMF in track is quick and easy thanks to the waiver of the glue. The robust construction of this insulated rail joint offers excellent…

    View details
  • kit for insulated rail joints made of steel with two-component glue

    IRJ ETW 2

    The IRJ ETW 2 is installed in track with a two-component glue. It is designed for the highest loads and is often used in high-traffic areas. Successfully used…

    View details
  • rail with factory assembled insulated rail joint made of steel

    IRJ ETW 1

    The IRJ ETW 1 is precisely installed on a rail in our factory with a high-strength two-component glue, ensuring maximum stability and durability. The installation of…

    View details
  • repairing of an insulating end post

    IRJ Repair Kit

    The IRJ Repair Kit contains all components for the temporary repair of damaged end posts. The repair takes less than 30 minutes. Train operation can restart just 20…

    View details

Do you have a question or need more information? Contact us!

(*) Mandatory fields